Noida International Airport (Jewar): Phases & Timeline
The Noida International Airport (NIA), commonly known as Jewar Airport, is a greenfield international airport under construction at Jewar in Gautam Buddh Nagar district, Uttar Pradesh. Spanning over 5,000 hectares, it is being developed in four phases over more than two decades. When all phases are complete, NIA is planned to be India's largest airport by capacity with five runways, a planned terminal area larger than Heathrow Terminal 5, and a 70 million passenger annual throughput. As of 2026, Phase 1 is in final commissioning, making this the year when the corridor from Greater Noida West to Jewar transitions from "promised" to "operational."
Quick Facts
| Attribute | Value |
|---|---|
| Official name | Noida International Airport (NIA) |
| Common name | Jewar Airport |
| Location | Jewar, Gautam Buddh Nagar, UP |
| Operator | Yamuna International Airport Pvt Ltd (YIAPL) — Zurich Airport International |
| Total area | 5,000+ hectares |
| Phase 1 capacity | 12 million passengers per annum |
| Ultimate capacity | 70 million passengers per annum |
| Runways (final) | 5 |
| Phase 1 status (2026) | Commissioning, operational late 2025-2026 |
| Distance from Sector 4 GNW | ~65 km / ~75 minutes drive |
The Four Phases of Noida International Airport
Phase 1 (Operational 2025-2026)
- Capacity: 12 million passengers per annum (MPPA)
- Runways: 1 (3,900 metres long, capable of handling all wide-body aircraft including A380)
- Terminal: 1 terminal, ~6 lakh sqm
- Aircraft stands: 25
- Status: Construction substantially complete, certification testing underway, first commercial flights expected late 2025 / 2026
Phase 2 (2030 Target)
- Capacity: Expanded to ~30 MPPA
- Runways: 2nd runway commissioned
- Terminal: Expanded with new piers and gates
- Cargo: Dedicated cargo terminal operational
Phase 3 (2035 Target)
- Capacity: ~50 MPPA
- Runways: 3rd and 4th runways commissioned
- Terminal: Second main terminal building
- Connectivity: Dedicated metro link expected
Phase 4 (2040+ Target)
- Capacity: Ultimate ~70 MPPA
- Runways: 5 runways operational (matching Heathrow's planned capacity)
- Terminal: Final third terminal complex
- Status: Largest airport in India, among the largest globally by capacity
Comparison: Jewar vs IGI Delhi
| Attribute | Noida International (Jewar) | IGI Delhi |
|---|---|---|
| Phase 1 capacity | 12 MPPA | — |
| Current capacity (2026) | 12 MPPA (Phase 1) | ~75 MPPA |
| Ultimate capacity | ~70 MPPA | ~109 MPPA (Phase 5) |
| Total runways (final) | 5 | 4 |
| Total area | 5,000+ hectares | 2,066 hectares |
| Distance from Greater Noida West | ~65 km | ~50 km |
Why NIA Phase 1 Matters for Property in 2026
Real estate prices typically respond to airport milestones in three steps. First, the announcement and land acquisition (Greater Noida West saw initial bumps in 2018-2019). Second, the start of construction (further appreciation in 2020-2022). Third, the start of operations — which happens in 2026 with NIA Phase 1. Historical data from comparable greenfield airports (Hyderabad, Bengaluru) shows the strongest appreciation phase typically begins around the operational start, not before. Greater Noida West sectors with direct expressway access to NIA — including Sector 4 — are positioned to benefit from this phase.
Connectivity from Greater Noida West to Jewar
- Yamuna Expressway: The primary road link, accessed via Pari Chowk; ~65 km drive (~75 minutes) from Sector 4 — see the Yamuna Expressway entry for details
- Eastern Peripheral Expressway: Bypass route around NCR ring; alternative for traffic routing — see the EPE entry
- Proposed metro link: Aqua Line extension to NIA is in the long-term planning horizon
- Proposed RRTS link: Delhi-NIA RRTS corridor under feasibility
Property Impact: Greater Noida West
The capital appreciation thesis for Greater Noida West rests on three pillars, of which Jewar is the largest. Historical data from other airport corridors:
- Bengaluru: Devanahalli area saw 300-500 percent appreciation over a decade post airport opening (2008-2018)
- Hyderabad: Shamshabad saw similar 4-5x appreciation over 2008-2018
- Greater Noida West: Property prices have already grown 2.5-3x from 2018 to 2026, partly anticipating NIA
Mini FAQ
What is the Noida International Airport?
A greenfield international airport at Jewar, Gautam Buddh Nagar, Uttar Pradesh. Being developed in four phases over 5,000+ hectares and planned to be India's largest airport by capacity when complete. Also commonly referred to as Jewar Airport.
What are the phases of Noida International Airport?
NIA is being developed in four phases. Phase 1 (2025-2026): 1 runway, 1 terminal, 12 MPPA. Phase 2 (2030 target): ~30 MPPA. Phase 3 (2035 target): ~50 MPPA. Phase 4 (2040+): ultimate ~70 MPPA, 5 runways.
Who is developing Noida International Airport?
The airport is being developed by Yamuna International Airport Pvt Ltd (YIAPL), a special purpose vehicle owned by Zurich Airport International. The project operates under a PPP with the Yamuna Industrial Development Authority and the Government of Uttar Pradesh.
When does Phase 1 of Jewar Airport start operating?
Phase 1 commercial operations are scheduled to begin in 2025-2026, with construction substantially complete and certification testing underway. The first commercial flights are expected to operate domestic routes initially, with international flights phasing in through 2026-2027.